ROCKEDGE Licensed Real Estate Broker · Tokyo Governor (3) No.94005
Reference nagano-hakuba-20758121-202606
Nagano City 5LDK Akiya — ¥25.0M, As-Is
Nagano City, Nagano · Hakuba Ski Resort
¥24,980,000 approx. $157,901 at ¥158.2/USD (2026-10-08)
- Land
- 286.95 ㎡
- Building
- 118.47 ㎡
- Layout
- 5LDK
- Built
- 1984
3 images supplied with the source listing.
Building
| Floors | Not recorded |
|---|---|
| Construction | Not recorded |
| Bedrooms | 5 |
| Bath / WC | Not recorded / Not recorded |
| Parking | Not recorded |
| Seismic standard | 1981 standard or later |
| Condition grade | C (our survey, A–E) |
| Renovation scope | partial |
| Last occupied | Not recorded |
Land & utilities
| Land rights | Freehold (所有権) |
|---|---|
| Zoning | Outside designated urban planning area (無指定) |
| Road access | Public road |
| Water | Municipal supply |
| Drainage | Septic tank (浄化槽) |
| Gas | LP gas (bottled) |
| Coordinates | 36.58672, 138.14395 |
Access
| Nearest station | Not recorded |
|---|---|
| From Tokyo | Not recorded |
Cost to own
| Asking price | ¥24,980,000 · $157,901 |
|---|---|
| Renovation estimate | ¥1,000,000 – ¥4,000,000 from observation, not from an opened-up building |
| Total investment | ¥27,329,400 – ¥30,829,400 $172,752 – $194,876 |
| Recurring fees | None stated in the source listing — not the same as none existing. Ask us to confirm. |
Short-term rental market — AirROI Nagano market (2026-09-12)
| Market averages |
$159 average daily rate · 41.9% occupancy ·
$20,844 (¥3,297,521) annual revenue per listing ·
141 active listings
Market averages for the municipality, not figures this property has earned. |
|---|---|
| Operating permission | Not verified Requires verification before purchase |
What has and has not been checked
- Not done Building inspection — nobody has opened up floors, walls or the roof space.
- Not verified Short-term rental permission — zoning, local ordinance, estate rules and licensing route.
- Checked Location — the municipality shown was resolved from the source listing's own address field and cross-checked against the coordinates above.
- Public road Road frontage — determines whether the site may be rebuilt on. Confirm the legal road status and frontage width at the municipality before you commit.