Fujigane Mountain Chalet
Where the forest meets the volcano.
Fujigane forest retreat near Lake Kawaguchiko — 2hr from Shinjuku via Fujikyu Line. Built 2004 in good condition. BBQ deck and fireplace are major Airbnb differentiators in this market. Fuji Five Lakes area recorded 49.8% average occupancy and $241 ADR in 2025 (AirROI data, 471 active listings).
Minpaku (short-term rental) status not confirmed. Verify with the municipal office and your agent before completing purchase. STR operation may be restricted to 180 days/yr or prohibited.
(conservative–optimistic)
(182 days avg)
(low–high investment)
Based on area averages from AirROI 2025–2026 (471 active listings). Not financial advice. Actual revenue depends on occupancy, management costs, and STR permit status.
Built 2004. Structural frame and roof in good condition. Deck, fireplace, and double-glazed windows intact. Interior finishes (kitchen, bathroom) may require partial refresh before STR operation. No major structural work expected.
Renovation estimate: ¥50万 – ¥200万
| Room | Size | Floor |
|---|---|---|
| LDK | 26㎡ | 1F |
| Bedroom 1 | 14㎡ | 1F |
| Bathroom + WC | 6㎡ | 1F |
| Entrance | 4㎡ | 1F |
| Bedroom 2 | 20㎡ | 2F |
| Storage | 12㎡ | 2F |
Source: AirROI 2025–2026 · 471 active listings analysed
⚠ Minpaku Status: Requires Verification
Requires verification before purchase
- ≈ 3.1km · 6minLake Kawaguchiko
- ▲ 20.5km · 40minMt. Fuji 5th Station
- ⊙ 4.8km · 10minKawaguchiko Station (Fujikyu Line)
- ◻ 2.2km · 5minConvenience Store
- ✚ 5km · 11minFujikawaguchiko Town Hospital
- Minpaku (STR) permit — Requires pre-purchase verification with municipal office
- Structural inspection — Not yet conducted. Recommend independent inspection (¥50k–¥100k) before purchase.
- Land rights: Confirm ownership vs. leasehold (借地権). Leasehold affects resale value and mortgage eligibility.
- Utilities: Verify water supply (public / well), sewage (公共下水 vs. 浄化槽), gas (city gas / propane — propane is 2–3× higher cost).
- Earthquake resistance: Built 2004 — post-1981 new seismic standard (新耐震)
- Acquisition costs: Budget +5–8% on top of purchase price (registration, agent fee, tax).