Nasu Town Single-Storey Farmhouse — 1,073㎡ Land
¥2.9M for 1,073㎡ of Nasu plateau land. Single-storey 5K. Rebuild or repurpose for STR near Japan's volcano-and-spa resort.
At ¥2.9M (US$19K), this single-storey farmhouse offers the lowest price-per-tsubo in this dataset — 1,073㎡ (324 tsubo) of Nasu plateau land for less than ¥2,700/tsubo. The 5-room layout is immediately liveable while renovation planning proceeds. Nasu Town draws year-round resort visitors from Tokyo: onsen culture, Mt. Chausu volcano, autumn foliage, and ski slopes. AirROI 2025–2026 records $328 ADR and $30,660 median annual revenue for 167 Nasu-area Airbnb listings. With ¥5–15M renovation, total investment ¥8.5–18.5M — gross yield 54%, payback 1.9–4.0 years. The 1,073㎡ plot is large enough for a guesthouse, garden terrace, and ample parking. Immediate handover available.
Minpaku (short-term rental) status not confirmed. Verify with the municipal office and your agent before completing purchase. STR operation may be restricted to 180 days/yr or prohibited.
(conservative–optimistic)
(119 days avg)
(low–high investment)
Built November 1978, pre-1981 seismic standard. Single-storey wood construction on expansive 1,073㎡ plot. Full structural survey required. Priced as land value — rebuild pathway recommended for STR use.
Renovation estimate: ¥5.0M – ¥15.0M
Source: AirROI 2025–2026 · 167 active listings analysed
⚠ Minpaku Status: Requires Verification
Requires verification before purchase
- ♨ 8km · 15minNasu Yumoto Hot Spring District
- · 10km · 18minNasu Ropeway (Mt. Chausu)
- · 12km · 22minNasu Animal Kingdom
- ⛷ 12km · 20minNasu Highlands Ski Area
- ◻ 5km · 10minConvenience Store
- Minpaku (STR) permit — Requires pre-purchase verification with municipal office
- Structural inspection — Not yet conducted. Recommend independent inspection (¥50k–¥100k) before purchase.
- Land rights: Confirm ownership vs. leasehold (借地権). Leasehold affects resale value and mortgage eligibility.
- Utilities: Verify water supply (public / well), sewage (公共下水 vs. 浄化槽), gas (city gas / propane — propane is 2–3× higher cost).
- Earthquake resistance: Built 1978 — pre-1981 seismic standard. Structural inspection critical.
- Acquisition costs: Budget +5–8% on top of purchase price (registration, agent fee, tax).